Mahindra eMax 22L

Mahindra eMax 22L

Complete specifications and technical data for the Mahindra eMax 22L. Compare with similar tractors from Mahindra and other manufacturers.

Quick Specs

Engine Power Output

22hp

Operating Weight

1,638 lb

Transmission

Hydrostatic and Gear

The Mahindra eMax 22L is a compact 4WD tractor designed for versatility and efficiency. It features a powerful steering system and offers both hydrostatic and gear transmission options, with 6 forward...

Photo Gallery

Image Gallery
Mahindra eMax 22L Tractor
Mahindra eMax 22L Tractor
Mahindra eMax 22L Tractor
Mahindra eMax 22L Tractor

Specifications

Manufacturer
Mahindra
Model
eMax 22L
Manufacturer
Kukje
Model
A1100N3
Power Output
22hp
Rated RPM
2,600RPM
Cylinders
3
Displacement
71.7ci
Bore
3.07in
Stroke
3.23in
Type
Hydrostatic and Gear
Length
100.5in
Width
45.8in
Height
91.3in
Operating Weight
1,638lb
System Type
Open Center
Steering Type
Power
Type
Rear: 540 (1.375), Mid: 2000 (1.0)
Hitch Type
Category I
Hitch Position
Rear
Drive Type
4WD
Steering Type
Power
Coolant
3.7qts
Type
ROPS

Compare to Other Tractors

Frequently Asked Questions

What is the engine power output of the Mahindra eMax 22L?

The Mahindra eMax 22L has an engine power output of 22 hp.

How many cylinders does the Mahindra eMax 22L have?

The Mahindra eMax 22L is equipped with a 3-cylinder engine.

What is the operating weight of the Mahindra eMax 22L?

The operating weight of the Mahindra eMax 22L is approximately 1,638 lb.

What type of transmission does the Mahindra eMax 22L have?

The Mahindra eMax 22L is equipped with a Hydrostatic and Gear transmission.

What type of hydraulic system does the Mahindra eMax 22L use?

The Mahindra eMax 22L uses a Open Center hydraulic system.

What maintenance does the Mahindra eMax 22L require?

Regular maintenance for the Mahindra eMax 22L includes checking and changing engine oil, hydraulic fluid, filters, and performing routine inspections as recommended in the owner's manual. Always refer to the manufacturer's maintenance schedule for specific intervals and procedures.